Northwest Roofing

Residential
& Commercial

Phone Today

0151 342 8769

Email Today

Northwest Roofing

Drone Survey

Drone Survey

Slate Roof

Roof checked for slipped or missing tiles, defective flashing and valleys and roof slopes for sagging.

Chimney Stack

Stack checked for brick erosion, missing pointing, soot marks, damage flashing and cracked pots.

Facias & Guttering

Fascias checked for rot or splits. Gutters checked for clogging, damage and missing components.

Slate Roof

Survey

Full survey to determine the extent of works required, type of materials and timescale needed to complete project.

Replacement

All underlay, battens and slate replaced. Ridge tiles, valleys and gutters installed. All flashing fitted and tested.

Inspection

Full inspection carried to check standards of work on all tile, ridges, valleys, gutters and flashing.

Northwest Roofing

Tile Roofing

Northwest Roofing

Built Up Felt Roof

Built Up Felt Roof

Preparation

All existing nails, felt and adhesive removed. Deck checked for rot, damp, split wood and free from projections.

Installation

First layer of felt nailed to decking, second layer bonded, gutter traps added, final layer bonded and sealed.

Inspection

Full inspection to check all seams and vertical edges are sealed and gutter drips and verges working correctly.

Liquid Plastics

Preparation

Roof brushed down to remove large debris. Chemical treatment applied for deep clean.

Application

First coat applied and textile bandage used for joins and corners. Second coat applied within 24 hours.

Inspection

Inspection to check for no bubbling and small debris and that all corners and verges are sealed.

Northwest Roofing

Liquid Plastics

Northwest Roofing

Emergency Repairs

Emergency Repairs

Call Out

Call received from client reporting a leak in a classroom that required immediate attention.

Inspection

Cherry picker was dispatched and an inspection was carried out to diagnose the problem.

Repair

Due to storm damage lead flashing and slate tiles replaced. Full visual inspection carried out.

Flat Roof

Preparation

All areas, clean free of debris, Sterling Board measured and fitted, gutter trim cut to size and fitted to facia.

Installation

EDPM measured to size and bonded with adhesive, edge trims fitted securely and joining clips attached.

Inspection

Visual inspection carries out on lining, trims and corners, roof water checked for leaks and cleaned

Northwest Roofing

Flat Roofing

Northwest Roofing

Maintenance Call Out

Maintenance Call Out

Inspection

Call received from client requesting inspection for periodic maintenance work on guttering, flat roof and brickwork.

Maintenance

All gutters cleaned and outlets flushed out, vegetation cleaned off brick work, flat roof cleaned and all debris removed.

Repair

Hydrosil resin applied to guttering, flat roof area primed, applied poly resin above entrance, brick work repointed.

Scroll to Top